2387
the development that will consist of the following works: (a) demolition and removal of existing build on-site, (b) the construction of a new Gas Fired open cycle Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine and 1 no. 44 m high Exhaust Stack, 1 no. AlS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelter, Associated Fin Fan Coolers, 1no. Storage and Warehouse building, 1no. fuel oil storage tank, 1no. dimineralised water storage tank, 1no raw/fire water storage tank, 1no. fire pump house, 2no. demineralised water treatment trailers, (c) the construction of a internal road network providing for access to serve the development, (d) provision of hard and soft landscaping works, tree planting and boundary treatments including parking, perimeter fencing