2370

1 no. coagulation tank, 1 no. backwash pumping station with above ground control building, 1 no. splitting chamber, 2 no. wash water holding tanks, 2 no. sludge balancing tanks, 1 no. bunded chemical storage facility with 3 no. chemical storage tanks, 1 no. sludge centrifugal building, 1 no. control equipment kiosk, 1 no. service water tank, 1 no. surface water attenuation tank and petrol interceptor, reconfiguration of existing control building layout, ancillary works including internal access road, pipelines, chambers, lifting apparatus and groundworks, associated with the development

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.