REPLACE EXISTING WINDOWS, DOORS AND 0.75M HIGH UPVC PANEL WALLS WITH NEW WINDOWS, DOORS AND 1M HIGH BLOCK CAVITY WALLS TO FRONT AND REAR FACADES OF THE BUILDING AND THE ERECTION OF TWO NUMBER FIRE DOORS TO REAR ELEVATION AND THE CARRYING OUT OF ASSOCIATED SITE WORKS AND SERVICES