23254
Part 8 - enhancement works at Raheen Public Park. The works involve developing 1460m of new trail of gradients no steeper than 1 in 15, this trail is to comprise of a 2m wide compacted graded stone base beneath a selected tight hoggin finish with 600mm grass verge on both side; construction of an access ramp to the new ramp at 1:15 gradient with landings every 5m; improving 220m of existing trail; development of Woodland Planting in line with a NeighbourWood Scheme under development; install concrete bases for hartecast phoenix benches to provided, spaced at a minimum distance along trail of 40m; install information boards about the ecology, archaeology, heritage and geology of the area
Granted