23132

The amalgamation of the PBKS & Derryvoghys GWS's. Consisting of the installation of a 1.7km long, 90mm outside diameter interconnecting pipeline, replacement of circa 0.6km of an existing 3" diameter pipeline with a new 90mm OD section of pipeline, replacement of circa 1.6km of an existing 2" diameter pipeline with a new 63mm OD section of pipeline, replacement of circa 3.7km of an exisitng 2" diameter pipeline with a new 63mm OD section of pipeline. Constructon of a new booster station alongside the proposed interconnecting pipeline. Decommissioning of the replaced section of pipeline within DMA001, 004 & 005 of the Derryvoghy GWS, decommissioning of the existing Derryvoghy source and pumping station, and all associated site development works above and below ground including installation of all necessary valves and chambers. (A NIS will be submitted with the application)

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.