23195
for development in the townlands of Ballyartney, Ballygeery East, Ballygeery West, Cloonkerry West, Cullenagh, KilKerin, Killofin, Knockphutteen and Lakyle North, Co Clare. The proposed development will include; (1) An extension of the existing Kilkerin Point 220 kV Line Cable Interface Mast (LCIM) compound, to facilitate new electrical equipment for the connection of two new 220 kV cable circuits, including: (a) A new control cabin (approximately 13.4sqm floor area by 3.5m high, which includes 0.85m ground clearance) and 2 no. parking spaces; (b) Associated 220 kV electrical equipment including, cable sealing ends, insulators, overhead conductors, surge arrestors and lightning masts measuring 15m high (tallest compound structure); (c) 220 kV underground cabling from the associated underground transition pits to the cable sealing end equipment; palisade fencing (approximately 2.6m in height, up to 3.5m in height, including anti-climb device) and gates; and associated landscaping. The development will also comprise; (2) A new fibre optic cable measuring an approximate length of 8.9km routed between Kilkerin Point LCIM compound (townland of Lakyle North) and Prospect 220 kV substation (townland of Ballygeery West); (3) Decommissioning of existing 220 kV electrical equipment, security fencing and gate at Kilkerin Point 220 kV compound; and (4) All ancillary site development works including site preparation works, site clearance and levelling, hardstanding, internal access tracks and temporary construction compound. This planning application is accompanied by a Natura Impact Assessment (NIS)