23186

for the construction of a 170 kW photovoltaic ground mounted solar array consisting of 432 Q-Cell 400 watt panels mounted on lightweight galvanised frames on lands north of the existing staff office. The works include the erection of a timber post and rail fence and a 140 meter long underground trench to connect the solar array to the existing above ground plant room. The works are within the curtilage of Ballynahinch Castle Hotel, a Protected Structure

Granted