23272

to raise the existing site level. Installation of a Synthetic all weather training pitch. Erection of 3 no. 10m High Floodlighting colums. 2.4m high fence with gates accessing the pitch. 3.6m high ball stop netting above the level of the pitch fencing. Relocating of existing localised foul and storm line and Installation of underground drainage

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.