23323
to raise of the existing site level. Installation of a synthetic all weather training pitch. Erection of 3 no. 10m high flood lighting columns. 2.4m high fence with gates accessing the pitch. 3.6m high ball stop netting above the level of the pitch fencing. Relocating of existing localised foul and storm line and installation of underground drainage
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.