2385

the carrying out of external works on a protected structure for the removal of an ATM infilled with glazing to match the existing. The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the bus stop sign and general Ulster Bank blue signage. Carry out internal works for the removal of the ATM's, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.