2360188

construction of a dwelling house with treatment system & percolation area and to remove trees and replant new trees with all ancillary site works

Refused

Core Refusal Reason

The applicant failed to demonstrate a genuine rural-generated housing need for a dwelling in an 'Area Under Strong Urban Influence' as required by the Westmeath County Development Plan 2021-2027.

Decision Maker's Conclusion

  • The applicant does not meet the local housing need criteria defined in Policy CPO 9.1, as his family connections and childhood home are located within the town of Mullingar rather than the specific rural area under strong urban influence.
  • The proposed two-storey dwelling design is considered excessively high and suburban in nature, failing to integrate with the receiving landscape or reflect the traditional rural vernacular required by Policy CPO 16.32.
  • Significant technical deficiencies remain regarding road safety and public health, specifically the failure to demonstrate adequate sightlines and the use of an incorrect location for the wastewater trial hole assessment.

Cited Policies (CDP)

CPO 9.1CPO 9.2CPO 9.8CPO 9.13CPO 16.32CPO 16.33CPO 16.34

Decision Document Summary

The proposal involved the construction of a 258sqm two-storey dwelling and a wastewater treatment system at Hopestown, Ballinea, Co. Westmeath. The site is located in a rural area designated as being under 'Strong Urban Influence' near Mullingar. The application was refused primarily because the applicant, who currently resides in London, failed to prove a functional or social need to live in this specific rural locality, with his family ties being rooted in Mullingar town. Additionally, the Pla...
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.