2360502

1) Upgrade, refurbishment, and alteration works to existing authorised office including: new internal layouts, new fire safety provisions including additional external doorways, new disability access provisions, ventilation, and new provisions for improved conservation of fuel and energy. 2) New single storey weighbridge building (c. 60 m2 gross floor area) to be located adjacent to existing authorised weighbridge, including: weighbridge office kiosk, canteen, welfare units including new accessible WC, & meeting room. The new building will be primarily required to facilitate systemic improvements to the recording of the waste types and quantities accepted into, and exported out of, the existing authorised facility. 3) New connection of proposed weighbridge building to existing on-site waste water treatment system (WWTS). 4) New solar photovoltaic (solar PV) renewable energy system including: solar panels mounted on existing facility building south facing roof leaf (c. 450 m2 of panel coverage), inverters, batteries, and all ancillary equipment and works. 5) Upgrade of acceptance limit of existing facility up to a maximum of 35,000 tonnes per annum of waste to reflect the available capacity of the newly as-built facility building, yard, and associated infrastructure completed under a previous planning permission. 6) Erection of canopy over existing authorised wash down bay (c. 72 m2). 7) Associated and ancillary works. 2 no. new structures / buildings: New single storey weighbridge building at c. 4.508 m high; and new canopy structure at 7.721 m high

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.