2360035

1. Installation of 24no. electric vehicle car charging bays, 2no. electric vehicle bus charging bays, and 2no. electric vehicle truck charging bays, each comprising a parking space and electric vehicle charging unit; 2. Installation of 59no. staff car parking spaces and relocation of 17no. truck parking spaces; 3. Installation of 10no. electric vehicle power unit’s c/w 2.0m high palisade fence enclosure; 4. Construction of extension to the existing ESB substation building (24sq.m); 5. Site development works to include the following, installation of 1no. covered bicycle parking area, 1no. covered smoking shelter, construction of 2no. dog walking tracks, acoustic perimeter fencing, site lighting, precast kerbing, surfacing, landscaping, and all associated drainage works

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.