2360158

397sqm Industrial Unit and all associated site works

Refused

Core Refusal Reason

Insufficient information to demonstrate that the existing surface water drainage system has the capacity to accommodate the proposed development in accordance with current standards, specifically regarding climate change allowances and flood risk management.

Decision Maker's Conclusion

  • The applicant failed to provide sufficient engineering evidence to prove the surface water system can accommodate the additional load while meeting current Greater Dublin Strategic Drainage Study (GDSDS) standards.
  • The drainage modeling omitted necessary allowances for climate change, which is a mandatory requirement for all new developments to ensure long-term infrastructure sustainability.
  • The lack of demonstrated capacity poses a risk of increased discharge into the river, potentially exacerbating downstream flooding and prejudicing public health, contrary to national flood risk management guidelines.

Cited Policies (CDP)

CPO16.21

Decision Document Summary

The proposal sought permission for a 397sqm industrial unit and associated site works at Block A, Bullford Business Park, Kilcoole. Wicklow County Council refused the application primarily due to technical deficiencies in the surface water management strategy. The planning authority determined that the applicant failed to demonstrate that the existing private drainage network could accommodate the additional load in compliance with current standards, particularly regarding climate change factors...