23816
(A1) RETENTION OF ALTERATIONS TO EXISTING ENGINEERING WORKSHOP WITH ALL ASSOCIATED SITE WORKS (A2) RETAIN CANOPY AS CONSTRUCTED BETWEEN TWO EXISTING BUILDINGS ON SITE (B) PLANNING PEMISSION TO CONSTRUCT (B1) A MINOR EXTENSION TO INCLUDE A ROOF ALTERATION, (B2) ALTERATIONS TO THE SITE/BUILDINGS EXTERNAL ENVELOPE WHICH WILL ACCOMODATE UPGRADE WORKS FOR FIRE COMPLIANCE, (B3) DECOMMISSION EXISTING SEPTIC TANK, INSTALL MECHANICAL TREATMENT UNIT, AND SAND POLISHING FILTER AND (B4) ALL ASSOCIATED SITE WORKS ON SITE B (C) CONSTRUCT A CAR PARKING AREA WITH ASSOCIATED SITE WORKS
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.