23178

Permission for development which consists of 1) the retention and completion of the slipway, 2) the demolition of the substandard boat house and its replacement with, 3) the construction of a two storey boat house building accommodating a repair/working dry dock inlet at the ground floor and the club house meeting room kitchenette, W.C and changing areas at the first floor, a cantilevered quayside boardwalk with floating pontoons at ground level and viewing deck to the water front at first floor and 4) all associated site works at Corrib Village, Newcastle, Galway on behalf of Galway Hooker Club. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.