2360205

the removal of the existing Chiller 7 structure and its associated primary pumps and concrete plinth at the northeastern portion of the site and the construction of a new concrete plinth to facilitate the installation of a heatpump, two no. chiller’s, a dry air cooler, pressurisation unit and electrical panel. The development will also include associated pipe connections back to the Takeda Building; b) the provision of a new concrete plinth to the southeastern portion of the site to provide a new Battery Energy Storage System compound which will contain a BESS container and a HV switchgear Container and associated transformer and inverters, cabling, ducting, landscaping and ancillary infrastructure and site development works necessary to facilitate the development

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.