23401

the demolition and removal of existing build on-site. The construction of a new Gas Fired open cycle Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine and 1 no. 44 m high Exhaust Stack, 1 no. AIS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelter, Associated Fin Fan Coolers, 1no. Storage and Warehouse building, 1no. fuel oil storage tank, 1 no. dimineralised water storage tank, 1 no raw/fire water storage tank, 1 no. fire pump house, 2no. demineralised water treatment trailers. The construction of a internal road network providing for access to serve the development. Provision of hard and soft landscaping works, tree planting and boundary treatments including parking, perimeter fencing

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.