The proposed development will consist of the following a roofed manure pit, a 5 bay loose shed & an underground effluent storage tank along with all associated site works. There will be two buildings and one concrete effluent tank. All effluent from the loose shed will be collected and stored in the proposed effluent tank while the manure pit floor will be sloped towards the back wall to collect all effluent as per DAFM specifications. The loose shed will be 6.38m in height and the roofed manure pit will be 4.87m in height. All structures are to be constructed in an existing farmyard our clients family have been farming for years. There is no protected structures close to the site or watercourses.