2360720
the construction of a new Disinfection Kiosk (approx. 3m W x 5m L x 2.77m H) ,dosing chamber and all ancillary groundworks on site. The kiosk will be divided into 2 rooms – one will contain the disinfection MCC and all the water analysers, the second room will contain the chlorine day tank (approx. 300lt) and the chlorine dosing pumps at the site of the existing borehole. A new 2.46 palisade security fence will be erected around the perimeter of the site with a lockable security gate to match the fence
Granted
Analysis not available for this case.
Decision Document Summary