2562309
(1) CONSTRUCTION OF A TWO-STOREY RESEARCH AND DEVELOPMENT AND OFFICE FACILITY BUILDING WITH INTERCONNECTION TO THE EXISTING WORKSHOP AND OFFICES, (2) CONSTRUCTION OF A SINGLE STOREY PITCH ROOF EXTENSION TO THE EXISTING WORKSHOP TO MATCH THE EAVES AND RIDGE HEIGHT OF THE EXISTING, (3) RELOCATION AND UPGRADING OF THE VEHICULAR ENTRANCE AND ALTERATIONS TO THE EXISTING ENTRANCE AND (4) INSTALLATION OF A NEW SEPTIC TANK / SEWERAGE TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.