23955
(a) for levelling and raising the level of existing brownfield site using a combination of existing rubble / topsoil along with some imported topsoil from local developments under construction. The level of the subject site is C. 1m higher than the original garden centre site. These works were carried out over a period of 12 months. (b) Full planning permission is also sought for the following: (i) New public amenity park with landscaped garden areas, walkway, children's play area and ancillary green spaces, (ii) New modular style community canteen, shed and storage building, connection to existing mains services for foul water and running water, and all associated development works
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.