2360383

development which will consist of the construction of a Reinforced Concrete Culvert Roof Slab over the existing open drain (for approx. 131m), to be supported on steel sheet piles which are currently being installed on either side of the open drain as part of the Athlone Flood Alleviation Scheme (Flood Cell 8 – Golden Island), and associated site works

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original