2360383
development which will consist of the construction of a Reinforced Concrete Culvert Roof Slab over the existing open drain (for approx. 131m), to be supported on steel sheet piles which are currently being installed on either side of the open drain as part of the Athlone Flood Alleviation Scheme (Flood Cell 8 – Golden Island), and associated site works
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.