THE DEVELOPMENT WILL CONSISTS OF: ERECT 9,381.00 M2 OR 1.20 MWp OF PHOTOVOLTAIC PANELS, GROUND MOUNTED SYSTEM, ON THE FIELD LOCATED AT THE LEFT AND THE NORTH OF THE MAIN EXISTING BUILDINGS, PHARMACEUTICAL PLANTS, WITH ALL ASSOCIATES SITE WORKS AT TEMMLER IRELAND LIMITED. THE SITE IS CURRENTLY OPERATING UNDER AN INTEGRATED POLLUTION CONTROL LICENCE ISSUED BY THE ENVIRONMENTAL PROTECTION AGENCY, P0813-02. THE DEVELOPMENT WILL COMPRISE PHOTOVOLTAIC PANELS WITH GROUND MOUNTED FRAMES WITH ALL ANCILLARY CABLING AND ELECTRICAL INFRASTRUCTURE; 1 NO. TRANSFORMER CABIN; USING ALL TEMPORARY WAYS, TEMPORARY CONSTRUCTION COMPOUND / SET-DOWN AREA AND THE FENCE AROUND THIS FIELD.