2360474

with the consent and approval of the Electricity Supply Board (ESB), for the construction of a new 220 kV Gas Insulated Switchgear (GIS) building (83.5m long x 18.5m wide (25.1m including staircases) 17m in height) (1,637 sqm); construction of a new 110kV GIS building (68.8m x 15.4m, (22m including staircases) 15m in height) (1,138 sqm); both of the GIS Buildings will have 8 no. associated air rods on each of the roofs (3m in height); construction of 4 no. 220/110kV Power Transformers to include connections to the new GIS buildings, 2 no. 220 kV and 1 no. 110kV line / cable interface towers and associated removal of 3 no. existing end masts, 3 no. lightning masts (height 22m) and cable connections to the 220 kV GIS Switchboard building; new internal access road and 10 no. new permanent car parking spaces; associated site excavation, infrastructural and site development works above and below ground, boundary treatment and landscaping, including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank; temporary use of the land associated with the existing farmhouse for the construction compound; and all ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, 2 no. construction compounds and cable connection for the Derryiron – Maynooth 110kV overhead line. Temporary construction and permanent access will be off the L5037. Planning permission is sought for a period of 10 years. A Natura Impact Statement will be submitted to the Planning Authority with the application

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.