2360423

The development will consist of the construction of 2.99acres/1.21ha or 1.6MW of Photovoltaic panels on ground mounted frames within a site area located to the south of the main production facility, associated ancillary cabling and ducting, electrical infrastructure, LV/MV Skid, transformer cabin and internal access tracks together with all associated site works.

Granted
Analysis not available for this case.