2360448

Planning Permission to erect 23,921.86m2 of photovoltaic panels on a ground mounted system located on the existing green area between the taxiway and the runway and all associated site works at Kerry Airport PLC. The development will comprise photovoltaic panels, 2.5 MWp with ground mounted frames with all ancillary cabling and electrical infrastructure, including a new trench for duct work at the switch room situated at the front of the main carpark; 1 no. lv/mv and transformer cabin; using all temporary ways to have access to the welfare facilities at the back of the hanger number 2.

Granted
Analysis not available for this case.