2460006
for changes made during construction, including; (i) curved, two-storey bay on front elevation replaced with square two-storey bay on front elevation, (ii) changes to window and doors, in both size and number of windows and doors, (iii) angled rear toilet and hallway squared, (iv) relocation of chimney on right-side elevation, (v) addition of window to utility room at rear, (vi) removal of study gable window on left side elevation, (vii) with plaster finish to chimneys, (viii) addition of 2 no. attic stores, landing and shower room, (ix) addition of 1 no. rooflight to front, and 5 no. rooflights to attic stores at rear, (x) with increase of height of roof pitch. For changes made to the garage, including; (xi) pedestrian door replacing window on right side elevation, (xii) window replacing pedestrian door on left side elevation, (xiii) with stone finish and brick surrounding openings to front elevation. (xiv) With relocation of the treatment system and percolation area to the rear of the dwelling. (xv) With connection to existing services and all associated site works for all works