2460012
for the restoration of an existing quarry to agricultural land. The quarry will be infilled with inert soil and stone, recontoured with top soil and reseed. It is estimated that approximately 110,000 tonne of inert soil and stone will be imported from local green field sites over a five-year period. To include the installation of a temporary wheel wash and all ancillary site works
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.