2427
for 1. New synthetic 400m 8 lane running track 2. New drainage and attenuation system 3. New 3.6m high perimeter fencing on alignment to match new provisions 4. New Shot Put, Hammer, Discus and Javelin infield throwing areas and associated containment netting 5. New High Jump, Steeplechase and Horizontal jump areas and associated facilities 6. New roofed and tiered spectator areas 7. New 4m grass training track and 1.1m high fencing 8. Repositioning Flood Lighting system locally to match new perimeter fencing in 3 above 9. 6 No. 10m long storage and dressing room Containers and Portacabins 10. 1 Water supply to Steeplechase jump and potable water points at Containers/Portacabins 11. All ducting, access points, emergency features and site development works 12. 10 No. roofed team dugouts. The proposed development also includes for all associated site development works, landscaping works. boundary treatments, SuDs features, drainage infrastructure, services infrastructure, bin stores, and upgrade of existing lighting etc.