Permission for (A) Construction of a 2 storey 4 bedroom dwelling, (B) Domestic Garage and (C) form new entrance piers with setback post and rail fence. C/W Wastewater treatment system To EPA CoP 2021 En12566-3 standards and all other site works as required at