2460320
the development that will consist of: A 10-year permission for the development of a solar farm on a site of 63.4 hectares consisting of the following: 301,000 sqm of solar photovoltaic panels on ground mounted steel frames; 10 hardstanding locations for electrical skids; new internal access tracks; underground power and communications cables and ducts; a new access from the L1219 public road; access gates; landscaping and biodiversity enhancement measures; security gates; boundary fencing and all associated ancillary development, site works and services. Installations of internal network cable to facilitate a future under-the fence connection from an on-site transformer compound to the existing Rathkeale 110kV substation which is located adjacent to the site. The on-site transformer compound will enclose an Independent Power Producer Building of 30.8 sqm, a 110 kV transformer, an 18 m high lightning monopole mast, and associated ancillary development. The solar farm will be operational for 40 years
Core Refusal Reason
The proposed development would have a significant adverse impact on the architectural heritage and setting of Ardgoulbeg House, a Protected Structure, and would negatively alter the rural character of the landscape.
Decision Maker's Conclusion
- The industrial scale of the solar array would irreversibly damage the historical and architectural setting of Ardgoulbeg House, a Protected Structure.
- The development would result in a significant negative visual impact on the rural character of the Ardgoulbeg area, which is not sufficiently mitigated by the proposed landscaping.
- The proposal fails to demonstrate that the development would not have a detrimental effect on local biodiversity and the integrity of existing hedgerows and habitats.