24105
chun (a) píosa don fhoirgnimh atá ann faoi láthair a scartáil, (b) sineadh de 162 m.cr. a chuir leis an fhoirgnimh, (c) athchóiriú agus athraithe a dhéanamh taobh istigh agus athraithe a dhéanamh ar na clónna, (d) uasghrádú a dhéanamh ar an gcóras cóireála mar aon le oibreach láithreáin eile gaolmhara a dhéanamh. Spás urláir comhlán na n-oibreacha beartaithe: 573 sqm, Spás urláir comhlán d'aon scartáil: 34 sqm
Refused
Core Refusal Reason
The application for an Extension of Duration failed to meet the statutory requirements of Section 42(1)(a)(i) of the Planning and Development Act 2000 (as amended) because substantial works had not been carried out on the site prior to the application.
Decision Maker's Conclusion
- The application must be assessed under Section 42(1)(a)(i) of the Planning and Development Act 2000 (as amended), as the previous provision for extensions based on commercial or economic considerations (Section 42(1)(a)(ii)) has been repealed.
- A site inspection conducted on 19th April 2024 confirmed that no substantial works have been carried out on foot of the parent permission (Ref. 19/514).
- The proposed extension of duration does not meet the mandatory legislative criteria, specifically the requirement that substantial works must have been completed during the appropriate period of the permission.
Cited Policies (CDP)
Decision Document Summary
This application sought an Extension of Duration for a development previously approved under Planning Ref. 19/514, which included the demolition of part of an existing building, a 162 sqm extension, internal renovations, and a wastewater system upgrade at Tí Joe Watty’s public house in Cill Éinne, Inis Mór. Although the applicant claimed commencement via first-floor renovations, the Planning Authority determined that these did not constitute 'substantial works' as required by current legislation...SOURCE PDFOpen Original