2460288
the development will consist of: (i) An extension to the permitted Clonymeath Solar Farm (Pl. Ref: 21/546, ABP Ref. 311760) comprising the construction and operation of a solar photovoltaic (PV) farm consisting of solar arrays on ground mounted steel frames with a maximum overall height of 3 metres above ground; (ii) 3 no. medium voltage power stations, underground electrical cabling and ducting, security fencing and CCTV stands; (iii) Provision of new internal access tracks linking with the access track permitted under Pl. Ref: 21/546, ABP Ref. 311760; (iv) Site drainage; (v) All ancillary site development works and apparatus. Planning permission is sought for a period of 10 years with an operational life of 35 years from the date of commissioning