24116
to replace the existing marquee function room with a new function room as a permanent structure upon the same footprint, the development will include toilets, bar, connections to existing services, (N.B. the effluent loading to the existing WWTP will be unchanged) including all required ancillary works. Gross floor space of proposed works: 370 sqm
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.