Permission for the construction of the Drogheda North Wastewater Pumping Station and Access Road, which will comprise: (1) a new wastewater pumping station with below ground wet well and dry well and associated chambers, below ground emergency storage tank, 4 no. above ground kiosks, 1 no. 6m high vent stack, 1 no. above ground emergency generator kiosk, 1no. above ground welfare building, outdoor lighting, and boundary fencing; (2) a new access road and new vehicular entrance from the realigned Twenties Lane, which will include the construction of a culvert across an open drain on site and the provision of footpaths and 2 no. uncontrolled pedestrian crossings; (3) 1 no. substation; and (4) all associated site development, landscaping, surface water drainage, and site excavation works above and below ground

Granted