2460304
development consisting of a mixed use development which will be the first phase of the development of the SDZ lands. The Phase 1 development includes 9 blocks with a total gross floor area (GFA) of 60579sqm (64953sqm including undercroft and basement car parks (4374sqm)). The development involves construction of a podium which establishes new ground/ street formation level which varies from c.4.6mOD to 8.4mOD which connects to the Sustainable Transport Bridge (by WCCC) at the Central Plaza. Provision is made for pedestrian connection from Central Plaza to Dock Road via the approved pedestrian bridge (by WCCC). A new riverside promenade / cycleway (part of Greenway) is proposed between the Sustainable Transport Bridge and the Eastern Access to the site. (See detailed description attached to Cover Letter)