2460330

for development consisting of 35no. house dwelling units comprised of 8no. House Type A 2-storey 4-bedroom semi-detached houses, 4no. House Type A.1 2storey 4-bedroom semi-detached dual fronted houses, 12no. House Type B 2-storey 3-bedroom semi-detached houses, 3no. House Type C 2-storey 3-bedroom semi-detached/ terraced houses, 4no. House Type D 2-storey 3-bedroom end of terrace houses, 4no. House Type E 2-storey 2-bedroom terraced houses, upgrades to existing pumping station, local roads & footpaths, site landscaping and amenity areas, boundary treatments, lighting, drainage, new road connection to Newtown Park and all associated infrastructure.

Refused

Core Refusal Reason

The proposal fails to demonstrate compliance with the 'Sustainable Residential Development and Compact Settlements Guidelines 2024' regarding separation distances and open space provision, alongside concerns regarding potential unauthorised works and insufficient technical documentation.

Decision Maker's Conclusion

  • The proposed layout fails to adhere to the 2024 Sustainable Residential Development Guidelines, specifically regarding the 16m minimum separation distance for opposing windows and the required 10-15% net site area for public open space.
  • Evidence of works underway on-site without apparent permission suggests potential unauthorised development, necessitating clarification and potentially a concurrent retention application.
  • The application is deficient in critical technical assessments, including a Housing Mix Report, Social Infrastructure Audit, and detailed drainage/SuDS proposals to mitigate historical flooding risks in the area.

Cited Policies (CDP)

H17H18DM 06Section 3.4.2Table 3.1Table 3.2Section 4.7Section 8.6Section 8.8DM 41Policy BD11

Decision Document Summary

The proposal involves the construction of 35 dwelling units at Newtown Park, Tramore, on a 1.58-hectare site zoned for 'Existing Residential' use. Although the principle of development is supported by the Waterford City & County Development Plan 2022-2028, the Planning Authority identified significant layout deficiencies, including substandard separation distances and open space provision that conflict with national guidelines. Furthermore, the presence of potential unauthorised works and the la...
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.