2460503

temporary road widening works and construction of temporary sections of stoned roads and all ancillary development on the R691 and L-2107-2 at bends and junctions to enable the delivery of turbine components. These works consist of; • Construction of a temporary section of stoned road located adjacent to the R691 in the townland of Harleypark to accommodate abnormal load deliveries. The works will require a temporary bridge crossing and all associated drainage and sediment protection, temporary works and storage area, temporary stockpiles and demolition and reinstatement of a section of stone wall to accommodate the works. • Temporary widening of section of the R691 in the townland of Harleypark to accommodate abnormal load deliveries comprising construction of a stoned area on a bend. • Construction of a temporary section of stoned road adjacent to the R691 in the townland of Harleypark to accommodate abnormal load deliveries. Works include the demolition and reinstatement of a section of stone wall to accommodate the works. • Construction of a temporary section of stoned road off the R691 at a second location in the townland of Harleypark to accommodate abnormal load deliveries. Works include the demolition and reinstatement of a section of stone wall to accommodate the works. • Construction of a temporary section of stoned road off the R691 and L-2107-2 in the townland of Ballingarry Upper to accommodate abnormal load deliveries. Works include the demolition and reinstatement of 2 no. sections of stone wall to accommodate the works. • Temporary widening of a section of the L-2107-2 in the townland of Gortnasmuttaun comprising construction of a stoned area at the wind farm entrance to accommodate abnormal load deliveries

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.