2460568
for a period of 10 years to construct and complete a solar PV energy development with a total site area of 80.9 hectares, comprising of the construction of PV panels mounted on metal frames, transformer stations, GRP units, internal access tracks, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, temporary construction compounds, widening of an existing entrance, landscaping and all ancillary infrastructure and associated works. The solar farm would be operational for 35 years. The export capacity to grid is estimated to be c. 56MW MEC. A Natura Impact Statement (NIS) has been prepared in respect of this application. Revised by Significant Further Information which consists of additional passing bays have been included in the Construction Traffic Management Plan
Core Refusal Reason
Failure to provide adequate technical assessments regarding noise impacts, traffic safety on narrow rural roads, and specific grid connection details.
Decision Maker's Conclusion
- The applicant failed to submit a baseline noise survey or comprehensive predicted noise levels, preventing a full assessment of the impact on residential amenity.
- The proposed haul routes (R402, L1004, L5013) were deemed narrow and unsuitable for construction traffic without the provision of passing bays and a more robust traffic management plan.
- The absence of specific grid connection details and the need for a revised Natura Impact Statement (NIS) meant that potential environmental and infrastructural impacts remained unresolved.