2481

for the construction of a warehouse building on the Northwestern portion of the site of their existing warehouse and logistics facility, comprising a portal frame metal clad structure and including roof mounted PV Solar Cells. The development will include a 2988 m2 ground floor space, loading bay facilities located at the Southeastern end of the building, access through existing site entrance, the closing of the existing entrance to the Northwestern portion of the site, connection to existing services on site, modification to existing concrete yards, relocation of existing car park spaces and all associated site works

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.