24164
development of a proposed floating moorings and wastewater pump-out, the proposed works involve the installation of a new floating jetty, which will consist of five new finger pontoons along with an adjoining new end jetty in the inner harbour, the plan includes the relocation and replacement of the existing refurbished foul water pump-out on the existing inner harbour wall with a new facility in a more accessible location on the harbour breakwater wall
No decision recorded
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.