2460463
development consisting of a) upgrading, reconfiguration, and extensions to existing Daycare Centre to be repurposed as a 6no. Bedroom Community Nursing Unit (floor area of ground floor extensions = 148.06sqm), construction of new Plant Room over at first floor level (floor area of first floor extension = 31.0sqm), and b) construction of a new standalone single storey Daycare Centre (floor area = 371.2sqm) to the front of the existing Hospital Building, together with 13no. additional car parking spaces, and all associated site works. The Post Box [Ref. No. 27-31] and Union Work House [Ref. No. 27-32] at Baltinglass District Hospital are Protected Structures
No decision recorded
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.