2460841

the development that will consist of the following: (1) The removal of 8 no. prefabricated classrooms (150m2). (2) The construction of a 5 storey (c.5,248m2) Applied Science and Information Technology (AS & IT) Building. The building will comprise Science Laboratories and Computer Rooms, General Teaching Spaces, Lecture Theatre, Staff Accommodation, Sanitary Facilities, Smarter Travel Changing Rooms, Ancillary Service Areas and Screened Planting setback at roof level. (3) The adaptation of existing standard car parking spaces to 8 no. universal parking spaces with a new set down area (Area c. 0.0423ha). (4) The provision of 148 no. new bicycle parking spaces comprising; (a) The construction of a covered and secure bicycle storage area comprising of steel racks for 88 no. bicycles (Area c. 0.0159ha). (b) The provision of 60 no. bicycle parking spaces located under the soffit of the proposed building. (5) The relocation of 1 no. existing bicycle shelter comprising 40 bicycle parking spaces. (6) The provision of a new pedestrian crossing and walkway. (7) The provision of Photo Voltaic (PV) Panels at roof level. (8) All associated site development works, site services, provision of Sustainable Drainage Systems (SuDS), and landscaping works

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.