2460704

The proposed development will consist of a.) a full decommissioning and removal of existing 0.8MW Wind Turbine b.) Construction of a new 2.35MW Wind Turbine with a hub height of 58.9 metres, a rotor diameter of 82 metres and an overall tip height of 99.9 metres c.) wind turbine foundation d.) hardstanding area e.) underground electrical cables and f.) all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with application the application.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.