2460490

for the development of the following: 1. Proposed alterations externally at existing main entrance – consisting of the regrading of the existing public footpath to create level access to the banking hall, while preserving the fabric of the existing Protected Structure, 2. Installation of surface water drain at entrance threshold to connect to existing public surface water drainage, 3. All associated site works

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.