the demolition of all existing structures within the Tinryland Wastewater Treatment Plant and the construction on an extended site (0.09 ha in total) which will consist of a new pumping station (17m2), new below-ground storm tank (total storage of 123m³), replacement welfare facility (33m2), ground-mounted photovoltaic array (83 m2), new palisade perimeter fencing (2.4m high) and associated works; the construction of a new rising main and gravity main (3.7km in length) along the Nurney Road, L1023 and N80, connecting to the existing wastewater sewer at Ballinacarrig; and all ancillary and associated temporary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Granted