2460479
(i) two new capacitor containers each measuring 13.7m x 2.7m x 2.9m placed on existing concrete slabs, (ii) one new inverter container measuring 5.9m x 2.35m x 2.37m placed on an existing concrete slab, (iii) access to the site is from the L-10093-2 which connects the R400 regional road, (v) all civil engineering and electrical engineering works to provide for connection to the electricity distribution network on site via the existing medium voltage substation within the site.
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original