SD23B/0197
The development will consist of the construction of a dormer window in the main roof to the rear of the house, removal of the existing half-hip to the side of the main roof and building up the gable, the construction of a frosted window in the gable wall of the house at attic level, the construction of a roof light to the front of the house and associated site works.
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.