251

the following development: a) The revision of the boundaries of the original single storey property on the site with the removal of its existing wastewater treatment system and to connect the wastewater disposal to the proposed scheme infrastructure. b) Retaining the existing eastern access laneway and incorporating same into the private open spaces of units numbered 1,2 and 3 which will include retaining the existing mature trees as per Arborist's report and landscape plan. c) To revise the vehicular access to the existing dwelling to use over the newly proposed scheme roads and footpaths. d) Ancillary works and appropriate boundary treatments to the existing dwelling. e) To construct a 4 no. unit housing scheme consisting of 2 no. single storey dwellings and 2 no. detached split level two storey dwelling. f) Connection to public services and utilities. g) Ancillary hard and soft landscaping h) Ancillary culvert bridge to accommodate traversing the existing watercourse with the scheme road and entrance i) Ancillary boundary treatments including the retaining of all mature trees and hedgerows where feasible, j) Ancillary works

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.